The Aomi Container Terminal, with a wharf 1,570 meters long and five side-by-side berths (three of which are high-standard berths), is one of the Port of Tokyo’s core container terminals.
This terminal has an exclusive terminal on its north side with two berths and a public terminal on its south side with three berths side-by-side.
TPTC began managing all berths including the public terminal as one unit starting in April 2009 to initiate a more efficient system of management and adniministration. As the agency designated with managing the public container terminal’s wharf, TPTC manages and administers the facility.
![]() ▲Aomi Container Terminal |
![]() ▲An approaching vessel |
![]() ▲Cargo handling by a transfer crane |
![]() |
|
Berth | Berth No.0 | Berth No.1 | Berth No.2 | Berth No.3 | Berth No.4 |
---|---|---|---|---|---|
Lessee | Sankyu Inc.・The Sumitomo Ware house Co.,Ltd. Isewan Terminal Service Co.,Ltd.・Nippon Express Co.,Ltd. Daiichi Transportation & Terminal Co.,Ltd. |
Hanjin Shipping | Evergreen Marine | ||
Terminal operator | Same as the above.(Joint usage by 5 lessees) | Mitsui Soko Co.,Ltd. Nippon Express Co.,Ltd. |
Suzue Corporation | ||
Major shipping companies |
WESTWOOD・CNC・YML・OOCL・T.S.Lines・ |
HJS OOCL COSCO GOTO SITC Winland |
EMC COSCO |
||
Total area | 66,946m2 | 100,755m2 | 72,255m2 | 116,623m2 | 122,500m2 |
Length | 260m | 260m | 350m | 350m | 350m |
Depth | -13m | -13m | -15m | -15m(planned water depth: -15m to -16m) | |
Container crane | 2units(Accommodating 15rows) | 2units(Accommodating 15rows) | 2units(Accommodating 18rows) | 1units(Accommodating 16rows) 2units(Accommodating 18rows) |
3units(Accommodating 17rows) |
DC(TEU) | 1,185TEU | 3,480TEU | 2,628TEU | 7,920TEU | 8,100TEU |
RC (Number of reefer plugs) |
142 | 305 | 78 | 270 | 540 |
Transfer Crane | ※ | ※ | ※ | 9units | 10units |
Opened | December, 2001 |
November, 1992 |
August, 1993 |
May, 1994 |
May, 1996 |
※With the Combined use of straddle carrier and chassis